ENERGY SYSTEMS
One system. Many connected decisions.
Start with demand, then consider supply, flexibility and the infrastructure that connects them.
Measure demand
→Reduce waste
→Match supply
→Add flexibility
Planning sequence, not a wiring diagram. Grid and engineering requirements apply throughout.
Efficiency & electrification
Establish an energy baseline from bills and interval meters. Compare lighting, motors, heating, cooling and operating schedules. Separate changes in production from genuine efficiency improvements.
Before a project
Record operating hours, peak load and process temperatures. Electrification can shift fuel demand onto electricity, so check electrical capacity and time of use.
Renewable generation & procurement
Solar and wind output depend on local resources, equipment and connection limits. Annual generation is not the same as supply at every hour.
Before a contract
Compare on-site ownership, service arrangements and power purchase agreements. Review renewable attribute ownership, counterparty risk, additionality and local accounting rules.
Storage & demand flexibility
Storage shifts electricity across time; it does not create energy. Usable capacity, inverter power, losses, degradation and controls all shape performance.
Before sizing
Define whether the priority is self-consumption, peak management or critical-load support. Backup requires suitable islanding, protection and controls.
Grid, controls & operations
Connection approvals, export limits, protection and cybersecurity affect what a system can do. Controls coordinate assets within those constraints.
Before implementation
Commission a location-specific engineering study, interval-load analysis and operating plan. Our planner provides an initial annual scenario only.
Try your assumptions →